{"id":7543,"date":"2021-02-26T04:37:52","date_gmt":"2021-02-26T04:37:52","guid":{"rendered":"https:\/\/www.esq.net.au\/?post_type=project&#038;p=7543"},"modified":"2021-06-08T05:32:39","modified_gmt":"2021-06-08T05:32:39","slug":"avion-development","status":"publish","type":"project","link":"https:\/\/www.esq.net.au\/?project=avion-development","title":{"rendered":"Avion Development"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p id=\"darkgreen\"><strong>CLIENT<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>Fraser Coast Regional Council<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>LOCATION<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>Hervey Bay Airport &#8211; Urangan, Qld 4655<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>COST<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>$10m est.<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>PROJECT OVERVIEW<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>ESQ provided the civil engineering detailed<br>design for the Avion Industrial development<br>adjacent to the Hervey Bay Airport. A project<br>managed by Fraser Coast Regional Council.<\/p>\n\n\n\n<p>The works involved the civil design of roads and<br>drainage infrastructure, which included a taxiway<br>and apron directly linking the development to the<br>Hervey Bay Airport runway.<\/p>\n\n\n\n<p>Because the development included works to the<br>existing airport, extensive consultation with<br>Council\u2019s Airport Operations management was<br>necessary to ensure all safety requirements were<br>achieved.<\/p>\n\n\n\n<p>ESQ were also involved during the construction<br>phase of the development, providing design and<br>construction advice to Council and the<br>Contractor.<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>SERVICES PROVIDED<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<ul class=\"wp-block-list\"><li>Roads and Drainage Design<\/li><li>Water and Sewer Reticulation Design<\/li><li>Stormwater Quality Modelling<\/li><li>Cost Estimating<\/li><li>Construction Phase Design Services<\/li><\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p id=\"darkgreen\"><strong>CHALLENGES &amp; SOLUTIONS<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>Due to contractual obligations Council had with<br>plane manufacturing company Astro Aero, the<br>development had to be designed, constructed<br>and operational within a 6-month timeframe.<br>ESQ was able to complete the design<br>documentation, including the submission to<br>Council from development approval, within five<br>weeks of the project being awarded. This could<br>only have been achieved by building a project<br>team capable of working closely and in unison<br>with one another to reduce delays between the<br>different disciplines.<br>The strong working relationship between ESQ\u2019s<br>project management team and the client meant<br>any issues encountered were resolved with<br>minimal disruption to the timeframe.<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>OUTCOME<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>ESQ\u2019s involvement in the project resulted in the<br>development being delivered on time.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"393\" src=\"https:\/\/www.esq.net.au\/wp-content\/uploads\/2021\/02\/Avion-Development-.jpg\" alt=\"\" class=\"wp-image-7786\" srcset=\"https:\/\/www.esq.net.au\/wp-content\/uploads\/2021\/02\/Avion-Development-.jpg 500w, https:\/\/www.esq.net.au\/wp-content\/uploads\/2021\/02\/Avion-Development--480x377.jpg 480w\" sizes=\"auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 500px, 100vw\" \/><\/figure>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>CLIENT Fraser Coast Regional Council LOCATION Hervey Bay Airport &#8211; Urangan, Qld 4655 COST $10m est. PROJECT OVERVIEW ESQ provided the civil engineering detaileddesign for the Avion Industrial developmentadjacent to the Hervey Bay Airport. A projectmanaged by Fraser Coast Regional Council. The works involved the civil design of roads anddrainage infrastructure, which included a taxiwayand [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7796,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[61],"project_tag":[],"class_list":["post-7543","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-portfolio"],"_links":{"self":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project\/7543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7543"}],"version-history":[{"count":1,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project\/7543\/revisions"}],"predecessor-version":[{"id":7805,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project\/7543\/revisions\/7805"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/media\/7796"}],"wp:attachment":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7543"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=7543"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=7543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}