{"id":7532,"date":"2021-02-26T04:33:53","date_gmt":"2021-02-26T04:33:53","guid":{"rendered":"https:\/\/www.esq.net.au\/?post_type=project&#038;p=7532"},"modified":"2021-06-08T05:37:17","modified_gmt":"2021-06-08T05:37:17","slug":"dolphin-waters-estate","status":"publish","type":"project","link":"https:\/\/www.esq.net.au\/?project=dolphin-waters-estate","title":{"rendered":"Dolphin Waters Estate"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p id=\"darkgreen\"><strong>CLIENT<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>Australian Land Co Pty Ltd<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>LOCATION<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>Burrum Heads, Qld 4659<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>COST<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>$50M est.<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>PROJECT OVERVIEW<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<p>Australian Land Co engaged ESQ to project manage this large master planned development in Burrum Heads which has several major environmental constraints.<\/p>\n\n\n\n<p>The project commenced in the mid 2000\u2019s and has seen approximately 500 allotments developed to date.<\/p>\n\n\n\n<p>With some 400 lots remaining, this project is a leader in the Burrum Heads market.<\/p>\n\n\n\n<p>Construction of two large lake systems, the retention of environmental corridors which are integrated into the development footprint ensure a superior amenity for residents in this development.<\/p>\n\n\n\n<p id=\"darkgreen\"><strong>SERVICES PROVIDED<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<ul class=\"wp-block-list\"><li>Value Added Development Approvals<\/li><li>TUFLOW Stormwater Management<\/li><li>SIDRA Traffic Modelling<\/li><li>Bulk Earthworks Modelling<\/li><li>Civil Engineering<\/li><li>Project Management<\/li><li>Contract Administration<\/li><\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p id=\"darkgreen\"><strong>CHALLENGES &amp; SOLUTIONS<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-background\" style=\"background-color:#b1ce34;color:#b1ce34\"\/>\n\n\n\n<ul class=\"wp-block-list\"><li>Challenge \u2013 Value Add existing approvals to improve viability of project for the client<\/li><li>Solution \u2013 ESQ Increased the lot yield, reduce costs by negotiating deletion of some development conditions.<\/li><li>Challenge \u2013 The site has pockets of protected vegetation that are unable to be cleared.<\/li><li>Solution \u2013 ESQ prepared a development layout cognisant of the areas of significant vegetation which allowed the development of precincts surrounded by vegetation. This provided secluded and aesthetically pleasing communities within the development and the ability to provide pedestrian links through the site via a pathway network that was not along road corridors.<\/li><li>Challenge \u2013 Significant up stream stormwater catchment<\/li><li>Solution \u2013 ESQ modelled an outcome that preserved the existing wetland function whilst ensuring a viable yield for the client.<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"269\" src=\"https:\/\/www.esq.net.au\/wp-content\/uploads\/2021\/02\/dolphin.jpg\" alt=\"\" class=\"wp-image-7789\" srcset=\"https:\/\/www.esq.net.au\/wp-content\/uploads\/2021\/02\/dolphin.jpg 500w, https:\/\/www.esq.net.au\/wp-content\/uploads\/2021\/02\/dolphin-480x258.jpg 480w\" sizes=\"auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 500px, 100vw\" \/><\/figure>\n\n\n\n<p class=\"darkgreen\" style=\"font-size:22px\">\u201cStaff from ESQ have partnered with us on this project from its inception. This long term relationship provides peace of mind in knowing ESQ always wants the best outcomes for our project.\u201d<\/p>\n\n\n\n<p class=\"limegreen\"><strong>~ ALC<\/strong><\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>CLIENT Australian Land Co Pty Ltd LOCATION Burrum Heads, Qld 4659 COST $50M est. PROJECT OVERVIEW Australian Land Co engaged ESQ to project manage this large master planned development in Burrum Heads which has several major environmental constraints. The project commenced in the mid 2000\u2019s and has seen approximately 500 allotments developed to date. With [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":7799,"comment_status":"open","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[61],"project_tag":[],"class_list":["post-7532","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-portfolio"],"_links":{"self":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project\/7532","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7532"}],"version-history":[{"count":2,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project\/7532\/revisions"}],"predecessor-version":[{"id":7819,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/project\/7532\/revisions\/7819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=\/wp\/v2\/media\/7799"}],"wp:attachment":[{"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7532"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=7532"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/www.esq.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=7532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}